Projects

All

#NameLength (km)Signing DateContract Sum (Bil)Stage
21MTWARA-MVINATA50.0019/01/201789.59On-going
22MPEMBA -ISONGOLE50.3006/01/2017107.55On-going
23MPEMBA -ISONGOLE50.3006/01/2017107.55On-going
24ONE STOP INSPECTION STATION (OSIS) - NYAKANAZI-20/12/201625.028On-going
25ONE STOP INSPECTION STATION (OSIS) - MANYONI-16/12/201624.91On-going
26KIDATU-IFAKARA66.9004/11/2016104.8On-going
27GEITA AIRPORT-09/09/201639.15On-going
28LUSITU-MAWENGI LOT250.0022/08/2016159.217On-going
29SANYAJUU-ALERAI32.2018/08/201652.194On-going
30MPANDA - IFUKUTWA - VIKONGE35.0029/07/201657.871On-going
31TABORA AIPORT PHASE II-30/06/201627.032On-going
32ARUSHA - HOLILI56.5006/12/2015139.346On-going
33TAZARA FLYOVER0.4215/10/201587.156On-going
34KIKUSYA - IPINDA - MATEMA34.6027/04/201556.911On-going
35MAFINGA - NYIGO70.5013/03/201576.987On-going
36KIA - MERERANI26.0012/02/201532.214Completed
37MWIGUMBI - MASWA50.3012/02/201561.462Completed
38NYIGO-IGAWA 63.8024/12/2014103.4On-going
39MANGAKA - NAKAPANYA70.5017/06/201464.75Completed
40KILIMASERA - MATEMANGA LOT B68.2030/04/201470.414Completed