Projects

On-going

#NameLength (km)Signing DateContract Sum (Bil)
21MTWARA-MVINATA50.0019/01/201789.59
22MPEMBA -ISONGOLE50.3006/01/2017107.55
23MPEMBA -ISONGOLE50.3006/01/2017107.55
24ONE STOP INSPECTION STATION (OSIS) - NYAKANAZI-20/12/201625.028
25ONE STOP INSPECTION STATION (OSIS) - MANYONI-16/12/201624.91
26KIDATU-IFAKARA66.9004/11/2016104.8
27GEITA AIRPORT-09/09/201639.15
28LUSITU-MAWENGI LOT250.0022/08/2016159.217
29SANYAJUU-ALERAI32.2018/08/201652.194
30MPANDA - IFUKUTWA - VIKONGE35.0029/07/201657.871
31TABORA AIPORT PHASE II-30/06/201627.032
32ARUSHA - HOLILI56.5006/12/2015139.346
33TAZARA FLYOVER0.4215/10/201587.156
34KIKUSYA - IPINDA - MATEMA34.6027/04/201556.911
35MAFINGA - NYIGO70.5013/03/201576.987
36NYIGO-IGAWA 63.8024/12/2014103.4
37NYAKANAZI - KIBONDO50.0027/04/201445.985
38TABORA - SIKONGE30.0031/03/201428.645
39KIDAHWE - KASULU50.0024/03/201441.88
40BULAMBA - KISORYA50.0005/11/201351.281