Projects

On-going

#NameLength (km)Signing DateContract Sum (Bil)
41NDONO - URAMBO52.0030/07/201059.764
42DODOMA - MAYAMAYA43.6528/06/201040.61
43BARIADI - LAMADI71.8009/09/200967.409
44SUMBAWANGA - MATAI - KASANGA PORT110.0008/09/2009133.287
45USHIROMBO - LUSAHUNGA110.0018/08/2009114.557
46MAGOLE - TURIANI48.6017/06/200941.891
47SUMBAWANGA - KANAZI75.0015/06/200978.841
48KANAZI - KIZI - KIBAONI76.6015/06/200982.842